CQI-15 WELDING PDF

Product Code: CQI Pricing requirements your organization needs to follow to develop a weld management system that provides for continual improvement, . This one day seminar will give an overview of CQI, Special Process: Welding System Assessment, which, along with internationally recognized quality. AIAG CQI Special Process: Welding System Assessment.

Author: Tora Douzahn
Country: Maldives
Language: English (Spanish)
Genre: Sex
Published (Last): 24 July 2006
Pages: 334
PDF File Size: 1.30 Mb
ePub File Size: 14.12 Mb
ISBN: 224-3-28203-537-7
Downloads: 70448
Price: Free* [*Free Regsitration Required]
Uploader: Zulkikree

If the welder has not welded in the specific operation in a 6 month time frame, the welder must be requalified to that operation. This matrix shall be readily available to management and customer at all times. If customer quality certification is given, then the year of the last assessment by the customer shall also be given.

Are In-Process and Final Tests performed at established frequencies? Gas, air, sensors, control cables, etc.

CQI Special Process: Welding System Assessment – PDF

It shall identify both primary and secondary backup personnel for the key functions as defined by the organization. The Quality Manager or designee is responsible for wwelding and documenting the disposition of quarantined material. You allways want to be informed about Automotive News? The welding organization shall develop and maintain a critical spare parts list and shall ensure the availability of such parts to minimize production disruptions.

If there is no common phone number for the facility, the phone number of the Operations Manager or Quality Manager shall be used.

  BAIXAR NBR 10004 PDF

Type s of Processing at this Facility: In the WSA, the word shall indicates a requirement for purposes of the self assessment. Name of the facility being assessed. A copy of CQI may be provided upon request, with additional cost billed to the participant. Operators shall be trained in material handling, containment action, and product segregation in the event of an equipment emergency including power failure. Ian Parris Company Address: How does the organization handle changes to process control parameters after initial customer approval?

System Assessment Special Process: The organization shall perform product capability studies for the initial validation of each process, after relocation of any process equipment, and after a major process change of any equipment or parameter. This book or any part therof must not be reproduced in any form without written.

Plant cleanliness, housekeeping, environmental, and working conditions shall be conducive to controlling and improving quality. Is there a written process specification for all active processes? The current version is. Such parameters shall not only be defined, they shall have operating tolerances as defined by the organization in order to maintain process control.

List the name stitle sphone number sand address esif available, of the principal participants from the weld organization.

Successive Job Audits Section 6. Assessor shall possess knowledge of and be familiar with the application of automotive quality core tools including statistical process control, measurement systems analysis, part approval, failure mode and effects analysis, and advanced quality planning. The control of suspect or non-conforming product is required to prevent inadvertent shipment or contamination of other lots. These procedures or work instructions shall include methods of addressing potential emergencies such as power failureequipment start-up, equipment shut-down, product segregation See 2.

  ANATOMIA HUMANA DE ROUVIERE TOMO 2 PDF

Welding System Assessments (CQI-15)

Testing and Calibration Labs. Latest revision of this document is available on the internet: It should be included in the layered process audit or other similar type quality review process. Far West Technology, Inc. How does the organization document and respond to quality spills, nonconformance, customer wepding Layered Process Audit Guideline.

O Box numbers may be given as additional information. Unplanned or emergency downtime greatly raises the risk of improper processing.

Supplier Quality Assurance Preface We strive to continually improve our process performance by meeting quality objectives. Each process path includes all combinations of equipment that are integrated in the performance of a welding process, e. A minimum of one job audit Section 6 shall be performed during each assessment.

It cannot be reproduced without authorized authority. Name of person performing self-audit: Initial product capability studies shall be conducted for all welding processes per each cql-15 path defined in scope of work and in accordance with customer requirements. The requirements stated above also apply to captive welding departments. The organization shall determine which parameters to include in such analysis.